ICWT was responsible for the complete construction and systems installation of six swimming pools at this coastal resort. The project included a leisure pool, diving pool, kids’ pool, and three additional pools, totaling 3,600 m³ of water volume. Systems provided included filtration, heating, and circulation tailored for 24/7 operation.

error: Content is protected !!